Profile:
1, can customize digital display, pointer display, liquid crystal display, computer control, high-speed thermal printer manual, intelligent operation box, cabinet, table.
2, high voltage voltage, low voltage current, 6 leakage current a total of 8 measurement methods, high-precision sensor and high-performance 14-bit AD acquisition chip.
3, human-machine dialogue full keyboard operation mode, intelligent work process, optional automatic pressure mode and manual pressure mode.
4, real-time display of high voltage, low voltage current, 6 leakage current, time and withstand voltage results, display intuitive and clear.
5. Automatically save the setting data, and display the last setting data after the power failure.
6, overvoltage, overcurrent protection, real-time set output voltage, low voltage current upper limit, leakage current upper limit and timing time.
7, with zero detection function, the test can be carried out after the zero is determined, safe and reliable.
8. Approximate voltage regulation algorithm, automatic voltage timing after reaching the set voltage, automatic voltage reduction back to zero after the end of the timing.
9, exceed the set low voltage current upper limit or leakage current upper limit, automatically cut off the voltage output, reduce the voltage back to zero, and sound and light alarm.
10, sophisticated hardware and software anti-jamming design, a variety of anti-jamming means, adapt to the harsh electromagnetic environment.
11, automatic error diagnosis, easy to find and solve problems.
12, optional remote communication, door interlock alarm light alarm bell, external voltage divider check interface.
Features:
KDJS-6 series insulation gloves voltage test device is a special equipment for insulating boots (gloves) batch test, which solves the previous irregular test method, simplifies the test procedure, improves the detection speed, reduces the detection intensity, ensures the safety of the detection personnel, and reliably identifies the leakage current of insulation gloves (boots), insulation aging and power frequency voltage and other parameters. Six insulated gloves (boots) can be tested simultaneously.